Advanced engineering and 3D parametric modeling, for the hydromechanical equipment for the 50 MW project in the following works:
- Diversion tunnel
- Loading Chamber
- Flood Evacuation
The development of blueprints and calculation memories for the detailing of the manufacturer.
ECODESIGN concept application for the recovery of existing equipment.